How to update a generator listing without confusing bidders

By SellMyGen Editorial Team

New information often arrives after the first equipment package is assembled. A simple revision log helps buyers tell whether an update changes identification, condition, pickup or the equipment included.

01

Keep one current master package

Choose a dated master inventory and document folder. Retain earlier versions separately rather than mixing old photos and new descriptions under identical filenames. Assign one person to maintain the current version. That person does not need to make every sale decision, but should know which information has been approved for sharing.

02

Classify each change

Record the date, affected field, earlier statement, corrected statement and supporting evidence. Separate a typo correction from a substantive change such as a new fault report or an excluded tank. If the new evidence remains uncertain, describe the uncertainty instead of replacing one unsupported statement with another.

03

Send an understandable change summary

When communicating with bidders through the agreed channel, identify what changed and which attachment replaces the old one. Do not assume buyers will notice a new serial number buried in a large PDF. Ask whether the update changes the bid, inspection requirement or collection plan, and retain the response with the revised package.

04

Freeze the accepted description

Before finalizing a transaction, identify the exact version of the equipment description used for the accepted offer. Keep later collection notes separate unless they change the agreed scope. A useful log entry reads: revision 3 adds the service report dated [date]; no accessories changed; buyer response pending. This records facts without implying acceptance.